Best Practice for Integrating Maximo Work Order system to Lawson Inventory

Sort:
You are not authorized to post a reply.
Author
Messages
Ollerton
Basic Member
Posts: 16
Basic Member
    We are working on a 2 way interface between lawson and maximo work order system.  Part of the workflow is staff will reserve materials on a work order in maximo. Maximo item master and inventory balances are syncronized with Lawson.  When someone reserves materials in Maximo, I want the interface to reserve the materials in Lawson. What is the best method to reserve the materials in Lawson? I need a pick ticket as a result. I was thing RQ10 as that is the method that people get materials now using RSS. Is there something in IC that I can use? IC500?  Any help is appreciated.  Jim Ollerton
    Ollerton
    Basic Member
    Posts: 16
    Basic Member
      After lots of research. I am going to use Processflow Intergrator and pump the records from maximo directly into RQ10. I am using the new eclipse version which makes it easier to deal with external sql server tables. The maximo data is in interface tables.
      Greg Moeller
      Veteran Member
      Posts: 1498
      Veteran Member
        You could use IC500. Or RQ500... depending on your setup/layout. We are using both here.
        Greg Moeller
        Veteran Member
        Posts: 1498
        Veteran Member
          IC52x will provide an Item Master interface... We're using a customized IC527 for that here.
          You are not authorized to post a reply.