Bev Edwards
Veteran Member Send Private Message
Posts: 366
Veteran Member

I have several items (gloves) that were set up some time ago with BX as the lowest UOM, primary buy on a bulk agreement and 1 as the Conversion factor.

Our distributor has made some changes and we can no longer buy BX as a bulk item from them so we needed to add CA to as a bulk item and move BX to a LUM agreement. 

Now, when an order is placed via RQC and BX is chosen, (via a template) instead of the BX price (250 pr per box), we're getting and EA price. 

How can I change this so the BX price is pulled into the req?

John Henley
Send Private Message
Posts: 3351
Did you check the UOMs on IC11 and IC12?
Thanks for using the LawsonGuru.com forums!
John
John Henley
Send Private Message
Posts: 3351
Also verify the item on PO13
Thanks for using the LawsonGuru.com forums!
John
Bev Edwards
Veteran Member Send Private Message
Posts: 366
Veteran Member

Hi John,

 I did check IC11, IC12 and PO13.3. They are all set up with BX as the primary and CA as the secondary.

There are 2 IC12 records for each item.

IC11, IC12 and PO13.3 all say BX as the UOM.

 

 

John Henley
Send Private Message
Posts: 3351
Are you referring to the unit cost on the req line, PO line, or both?
If you purchase via RQC (without a template) using BX as the UOM, what is the result?
Thanks for using the LawsonGuru.com forums!