Addin for LP80

 0 Replies
 0 Subscribed to this topic
 1 Subscribed to this forum
Sort:
Author
Messages
Paul Berkowitz
Basic Member Send Private Message
Posts: 14
Basic Member
Is there a why to use LP80 to perform a mass transfer to manual PTO plans. LP80 requires Transfer Actions, the Transfer "T" is is assigned to F1 however the LP80 addins does no thave F1 as an options. Is there another way?

Thank you Paul