We are having an issue that is inconsistent and I'm having a hard time pin-pointing the cause (or maybe we just need a patch). We had two requisitions both for Grainger Punchout that had multiple lines. Each requisition had a different requesting location. The PO's were created but instead of creating two separate PO's, which would be accurate in this situation, it created a separate PO for every line from each requisition. We had this happen a couple weeks ago too but a different vendor, different source for the requisition (QSight), and different user.
The RQ01's for each location are setup differently, so I can't find the problem there. It was the same requester for both requisitions and both reqs came from Grainger Punchout. Not all of our Grainger Punchout reqs are doing this.
Has anyone encountered this problem before? I couldn't find anything on Infor Xtreme.