PO120 EDI orders

 7 Replies
 3 Subscribed to this topic
 43 Subscribed to this forum
Sort:
Author
Messages
Chesca
Veteran Member
Posts: 490
Veteran Member
    I want to be able to run a multistep job that will create and release POs, create EDI orders and then transmit all these POS at once to GHX. Does anybody know if this is possible or do I need to schedule a PO120 and an ED501 for each vendor?

    PO100 for vendor A and location A and B, vendor B location A, Vendor C location D
    PO120 same as above
    ED501 - take all the EDI orders created by PO120 and transmit to GHX
    Kat V
    Veteran Member
    Posts: 1020
    Veteran Member
      Yes - We have EDIDLY (EDI Daily) that runs every 30 minutes.

      Step 1 is PO120 with the following parameters:
      Company: 1 (we only have 1)
      Draft (N)
      Selection Tab - all blank
      PO Selection - all blank
      Documents Tab: EDI Sub Tab
      Issue Y
      Form 2 (Sequential File)

      This grabs all Released, Not Issued POs set for E (EDI) and issues them.

      Step 2 is the ED501.

      Works beautifully.
      Chesca
      Veteran Member
      Posts: 490
      Veteran Member
        Do I need a PO120 for each vendor we have setup with EDI? We have about 15 vendors
        JimY
        Veteran Member
        Posts: 510
        Veteran Member
          No you would not. In PO120 there is an EDI tab that you would enter the values needed to select PO's that are destined for EDI. In the Selection tab leave the vendor field blank.
          Kat V
          Veteran Member
          Posts: 1020
          Veteran Member
            No you would only need a job per Company with the vendor left blank.
            Chesca
            Veteran Member
            Posts: 490
            Veteran Member
              OK, so I can add a PO120 for a company leave vendor blank and that will create a POEDI with all the vendors released by PO100, right?
              JonA
              Veteran Member
              Posts: 1163
              Veteran Member
                As long as the POs have the PO Issue Method flag set to issue via EDI and your PO120 job is set up as Kat described above, then yes.
                Jon Athey - Sr. Supply Chain Analyst - Materials Management - MyMichigan Health
                darwin collins
                Posts: 19
                  Thanks for the info. We just went live with taking a BN106 -> EDI 834, and the boss is having us look at PO120 EDI.