hussey1213
Basic Member
Posts: 16
Basic Member
    I have an employee that was hired with the incorrect date; 07/12/2018. When attempting to separate them we are getting the message "POS Level 01 effect date 07/12/18 is greater than term date". The employee has only a single position record dated 7/12/2018. Can anyone provide thoughts on how to get this term processed.
    promiseevans
    New Member
    Posts: 3
    New Member

      You have to term them effective 7/12/2018.  That is their start date in the system, therefore, the system does not see them as truly *existing* before 7/12/2018.  I would suggest changing the effective date of the position to the correct start date of 7/12/2016 (I assume) before trying to term or rehire them.

      Margie Gyurisin
      Veteran Member
      Posts: 538
      Veteran Member
        If you can add a record with the same data and the correct effective date, you should be able to delete the "bad" record, remove the end date on the "new" record and then term.