Does anyone use the PO line delivery date as a means to evaluate vendors? We have our inventory items control code set as "S" (system generated) in IC12. So the system generates the lead time based on the last two PO receipts. But does not take into account weekends / holidays.
Does anyone do anything different?
Thanks for the input.
Sheri