WOSCHEDHDR FILE Work Order Schedule Header The Work Order Schedule Header file is used to hold scheduling information during the Work Order production scheduling process. It will contain one record for each finished good item that is in the process of being scheduled. UPDATED BY WO20.1 FIELD NAME DESCRIPTION/VALID VALUES UPDATED BY WOH-COMPANY Numeric 4 WO20.1 Company This field contains the company number, as defined in the Inventory Control system. WOH-LOCATION Alpha 5 WO20.1 Location This field contains a valid stock location within the company inventory. It is also the production facility where finished goods are produced. WOH-ITEM Alpha 32 WO20.1 Item This field contains the item identifier for the finished good to be scheduled for production. The item number is defined in the Inventory Control system. WOH-OBJ-ID-HDR Numeric 12 WO20.1 Object ID Header The header object ID is used to associate a group of work order schedule records to a record in this file. WOH-OBJ-ID-DTL Numeric 12 Object ID Detail The detail object ID field in this file is used to hold a value to relate work order schedule records to work order schedule detail records. WOH-DOC-DMND-VIEW Alpha 1 WO20.1 Document Demand View Document demand view indicates if document demand records are to be viewed in summary or detail during the work order scheduling process. D = Detail S = Summary WOH-DATE-USED Alpha 1 WO20.1 Date Used This is the date used for the work order scheduling process. The date needed or production start date is used to determine what scheduling period includes specific demand. N = Date Needed P = Production Start Date WOH-PREV-DATE Numeric 8 (yyyymmdd) WO20.1 Previous Date This is the end date of demand to include in the previous period. WOH-PER-1-DATE Numeric 8 (yyyymmdd) WO20.1 Period 1 Date This is the end date of demand to include in period 1. WOH-PER-2-DATE Numeric 8 (yyyymmdd) WO20.1 Period 2 Date This is the end date of demand to include in period 2. WOH-PER-3-DATE Numeric 8 (yyyymmdd) WO20.1 Period 3 Date This is the end date of demand to include in period 3. WOH-FUTURE-DATE Numeric 8 (yyyymmdd) WO20.1 Future Date This is the end date of demand to include in the future period. WOH-CALENDAR Alpha 15 Calendar This field contains the name of the calendar to check when determining the production start date if it is the date used. The calendar is also used to check for contiguous days if the finished good requires contiguous days for production. WOH-WORK-ORDER Numeric 8 WO20.1 Work Order This identifies the work order number that will be assigned to the first work order created from a selection or release process of production scheduling. This field is required if work order numbers are manually assigned for the production facility. No value may be entered in this field if work order numbers are automatically assigned for the production facility. WOH-STATUS Numeric 1 WO20.1 Status The four statuses of work orders created from the production scheduling process are as follows. 1 = Unreleased 2 = Released 3 = Exploded 4 = In Production WOH-START-DATE Numeric 8 (yyyymmdd) WO20.1 Start Date This is the production start date to default to the first work order created from the selection or release process of production scheduling. WOH-END-DATE Numeric 8 (yyyymmdd) WO20.1 End Date This is the production end date to default to the first work order created from the selection or release process of production scheduling. WOH-CAPACITY Numeric 8 WO20.1 Capacity This is the maximum quantity of a finished good that may be scheduled to a single work order. If no value is typed, no capacity checking occurs when the schedule is being released. WOH-FIRM-FL Alpha 1 WO20.1 Firm Flag This indicates if the finished good gets allocated to the originating source document demand when one work order is being created from one order or requisition using the production scheduling process. WOH-USER-ID Alpha 10 (Lower Case) WO20.1 User ID This contains the user ID of the person who is doing the production scheduling process. WOH-CREATE-DATE Numeric 8 (yyyymmdd) WO20.1 Create Date This is the date that the production scheduling process was started. WOH-UPDATE-DATE Numeric 8 (yyyymmdd) WO20.1 Update Date This is the date of the last activity done for the production scheduling process on a finished good. WOH-UPDATE-TIME Numeric 6 WO20.1 Update Time This is the time of the last activity done for the production scheduling process. WOSCHEDHDR FILE INDEX NAME KEY FIELDS DESCRIPTION / SUBSET CONDITION USED IN WOHSET1 COMPANY This index is used to access Work Order WO20.1 WO20.2 LOCATION schedule header records for a finished ITEM good for a production location. WOHSET2 OBJ-ID-HDR This index is used to access Work Order schedule header records for a specific header object ID. WOSCHEDHDR FILE RELATIONS ONE TO ONE RELATIONS RELATION RELATED NAME FILE INTEGRITY RULES / FIELD MATCH Iccompany ICCOMPANY Required WOH-COMPANY -> ICC-COMPANY (ICCSET1) Iclocation ICLOCATION Required WOH-COMPANY -> ICL-COMPANY WOH-LOCATION -> ICL-LOCATION Itemgroup ITEMGROUP Not Required ICC-ITEM-GROUP -> ITG-ITEM-GROUP Itemloc ITEMLOC Required WOH-COMPANY -> ITL-COMPANY WOH-LOCATION -> ITL-LOCATION WOH-ITEM -> ITL-ITEM Itemmast ITEMMAST Required ICC-ITEM-GROUP -> ITE-ITEM-GROUP WOH-ITEM -> ITE-ITEM WOSCHEDHDR FILE RELATIONS ONE TO MANY RELATIONS RELATION RELATED NAME FILE INTEGRITY RULES / FIELD MATCH Woschedule WOSCHEDULE WOH-OBJ-ID-HDR -> WOS-OBJ-ID-HDR WOS-DEMAND-TYPE WOS-DATE WOS-SYSTEM-CD WOS-DOC-NBR WOS-LINE-NBR |