PFlow Scheduler Duplication

 1 Replies
 0 Subscribed to this topic
 52 Subscribed to this forum
Sort:
Author
Messages
vc727
Advanced Member
Posts: 44
Advanced Member
    I have several processes that are triggered by the pflow scheduler at various times. Some time in the past two weeks it appears that the scheduler is running each of these twice once which fails and once which completes. The problem is that most of these flows have an email that sends info to people accross the organization. The email is coming to them populated with undefined as every data item. Has anyone else seen this and if so what was the resolution?
    Shane Jones
    Veteran Member
    Posts: 460
    Veteran Member
      Eric, did you ever ever get this resolved? We had the same issue and it was a Lawson Bug. Had something to do with the "Scheduler Grace" period for missed jobs. I seems to remember that I needed to give it more grace period time because the shorter time period was causing scheduler to think it missed a "running" job and then it would trigger the schedule again. I just changed the grace period and the issue stopped. (There might be a fix for this but I never installed it - specifically.)
      Shane Jones
      Tools: HR, Payroll, Benefits, PFI, Smart Office, BSI, Portal and Self-Service
      Systems: Lawson, Open Hire, Kronos, Crystal Reporting, SumTotal Learning
      ** Teach others to fish...