Process Flow Scheduling

 11 Replies
 0 Subscribed to this topic
 52 Subscribed to this forum
Sort:
Author
Messages
Chad Dirst
Advanced Member
Posts: 42
Advanced Member
    How can I setup five seperate process flows to run consecutivley?  I prefer to use existing functionality and not build anything that would call each of these flows individually.  Please advise.
    Thank you,
    Chad
    David Williams
    Veteran Member
    Posts: 1127
    Veteran Member
      Using a Service, you can define the Service Process Definition screen and reference 5 distinct flows to trigger all at the same time.
      David Williams
      Chad Dirst
      Advanced Member
      Posts: 42
      Advanced Member
        Alright.... I have setup the service and tied the flows to it.  However, I can't see this service in the Process Flow Scheduler / Process dropdown?  Any ideas on what I am missing?
        Thanks.
        jamesraceson
        Veteran Member
        Posts: 52
        Veteran Member
          Chad,

          Just to check a couple of things: 1. Is the service active? 2. Was the service set up as an administrative service? If so, then you must make sure that you (or the user who is signing into the PF Scheduler) is assigned an administrative task through PF Admininstrator. This way you can see the service that you set up. Another way that you could have the flows run consecutively would be to put a WorkObject node at the end of each flow calling the next one. Unfortunately with that approach, if one of the flows hangs or fails, it will not "trigger" the other flows down the line. Depending on what you are doing (for example working with files on the server) this might be desirable as you would not want the other flows to run if one of the previous ones failed.
          Chad Dirst
          Advanced Member
          Posts: 42
          Advanced Member
            The Service Definition is set to "1 - Enabled".  Also, my user id is set as a Process Flow Administrator.  I am not sure what you mean when you say "Was the service setup as an administrative Service?".
            Chad
            BarbR
            Veteran Member
            Posts: 306
            Veteran Member
              If you are in the ProcessFlow Scheduler, you won't see Process Flow SERVICES in the drop down, only FLOWS. Flows are scheduled, Services are triggered (either manually through the PF Admin Tool or from a flow node).
              BarbR
              Veteran Member
              Posts: 306
              Veteran Member
                BTW, it's my understanding that you wanted the five flows to run consecutively, not concurrently. If true, you do not want to tie all of the flows to a single service.
                I would define flow #1, and schedule it to run at, say 5:00am.
                At the end of that flow, if all went well, I would use the WorkObject node to trigger the service for flow #2. At the end of flow 2, if all went well, I would use the WorkObject node to trigger the service for flow #3, and so on.
                So you have five process flows, and four services tied to flows #2 through #5.
                jamesraceson
                Veteran Member
                Posts: 52
                Veteran Member
                  Chad,

                  Sorry about the confusion; I meant the task associated with the user signing in was assigned an administrative task.
                  Chad Dirst
                  Advanced Member
                  Posts: 42
                  Advanced Member
                    Thank you to all.
                    Chad Dirst
                    Advanced Member
                    Posts: 42
                    Advanced Member
                      I have defined my one flow which calls fives seperate work objects in which each one is executing a service.  The problem is when the flow runs all five services are kicked off at the same time.  Does anyone know how I can make each service dependent on the previous?  Thanks.
                      BarbR
                      Veteran Member
                      Posts: 306
                      Veteran Member
                        Please see my 4/18 post - solution is there
                        Chad Dirst
                        Advanced Member
                        Posts: 42
                        Advanced Member
                          I did create one overall flow which calls the five (5) services via a work object. 

                          I need to determine if there are multiple ways to determine "if all went well" in the first service before executing the second service and so on.  I have just put in a loop that will query the WFWORKUNIT table to determine if the first service is still running or completed successfully before executing the next service. 

                          Is this the only way to consecutively run multiple services in one flow?
                          Thanks.