Addin for LP80

 0 Replies
 0 Subscribed to this topic
 1 Subscribed to this forum
Sort:
Author
Messages


Paul Berkowitz











Basic Member



Posts: 14




Basic Member



    Is there a why to use LP80 to perform a mass transfer to manual PTO plans. LP80 requires Transfer Actions, the Transfer "T" is is assigned to F1 however the LP80 addins does no thave F1 as an options. Is there another way?

    Thank you Paul